JFE Engineering 受让神奈川县足柄上卫生组合一般废弃物处理设施整建营运事业
尚無 AI 分析資料。
常見問題
- Q: What is the "New Combustible Waste Treatment Facility Development and Operation Project"?
- A: It is a project awarded to JFE Engineering by the Ashigami Upper Waste Management Association in Kanagawa Prefecture. It involves the development and operation of a new incineration facility to consolidate existing waste treatment centers for six municipalities.
- Q: Which municipalities are involved in this project?
- A: The project involves Minamiashigara City, Nakai Town, Oi Town, Matsuda Town, Yamakita Town, and Kaisei Town, forming a wide-area treatment system.
- Q: What is the capacity of the new incineration facility?
- A: The new facility will be equipped with stoker type incinerators, with a capacity of 40 tons per day per furnace, and will have two furnaces.
- Q: What is the DBO method mentioned in the article?
- A: DBO stands for Design, Build, and Operate. It is a project delivery method where a single contractor is responsible for the design, construction, and long-term operation of the facility.
- Q: What advanced technologies will JFE Engineering implement in this facility?
- A: JFE Engineering will implement its proprietary "Counter-flow Combustion Method" (an evolution of "High-Temperature Air Combustion Technology"), the fully automated operation system "BRA-ING", and the AI smoke detection system "Smoke AI®". Remote monitoring and support will be provided from their Global Remote Center.
- Q: What is the operational period for this project?
- A: JFE Engineering has been contracted for a 20-year operation period.
- Q: How does this project contribute to SDGs?
- A: As a leading company in waste-to-energy plants, JFE Engineering aims to achieve SDGs and solve social issues through the effective utilization of waste, providing optimal technologies tailored to customer needs.