为应对大雨洪水,4月24日于诹访排水樋管实施夜间综合排水演练
尚無 AI 分析資料。
常見問題
- Q: What was the purpose of this drill?
- A: The drill was conducted to strengthen the city's response capabilities for heavy rain in preparation for the flood season, which begins in June.
- Q: When and where did the training take place?
- A: The training took place on Friday, April 24, Reiwa 8 (2026), from 9:30 PM to 10:40 PM at the Suwa Drainage Sluice Pipe in Takatsu Ward, Kawasaki City.
- Q: What situation was simulated during the drill?
- A: The drill simulated a scenario where heavy rain caused the Tama River's water level to rise, necessitating measures to prevent river water backflow and drain inland water using pumps.
- Q: Who participated in the training?
- A: A total of 70 people participated, including 50 staff members from the Kawasaki City Waterworks and Sewerage Bureau and 20 personnel from cooperating businesses.
- Q: What specific activities were part of the drill?
- A: The drill included staff assembly, on-site patrols, information sharing, email news distribution, and the setup, deployment, and operation of drainage pump vehicles and hoses.