TESS Group Begins Supply of Renewable Energy via On-site PPA to Toyo Mobius Co., Ltd.'s Takatsuki Logistics Center
NQ Score
50/100
AI Summary (NQ-processed)
TESS Group starts supplying renewable energy electricity to the Toyo Mobius Takatsuki Logistics Center.
AI analysis data is not yet available.
Frequently Asked Questions
- Q: When did TESS Engineering begin supplying renewable energy to the Takatsuki Logistics Center?
- A: TESS Engineering began supplying renewable energy electricity to the facility in February 2026.
- Q: What is the estimated annual power generation capacity of the installed solar power system?
- A: The estimated annual power generation of the self-consumption solar power system is approximately 2.61 million kWh.
- Q: How much CO2 emission reduction is expected annually from this renewable energy project?
- A: The project is expected to reduce CO2 emissions by approximately 1,086 tons annually.
- Q: What is the generation capacity of the solar power system installed on the roof of the facility?
- A: The generation capacity of the solar power system is approximately 2.3 MW.
- Q: Where is the Toyo Mobius Co., Ltd. Takatsuki Logistics Center located?
- A: The Toyo Mobius Takatsuki Logistics Center is located in Takatsuki City, Osaka Prefecture.