Wanli Creek Landslide Dam Just 75cm from Overflow! Hualien Issues Red Alert, Reveals Preventive Closure Times for Rail and Road
NQ Score
92/100
N1 Content Completeness
10
AI Summary (NQ-processed)
The Forestry Bureau reported on the afternoon of the 16th that the water level of the landslide-dammed lake on Wanli Creek in Hualien County is just 75cm from overflowing. Hualien County Magistrate Hsu Chen-wei declared a red alert and initiated mandatory evacuations. Wanrong Village suspended work and classes from 3 p.m., and six villages are under evacuation orders. Four bridges are under preventive closure, and Taiwan Railways will suspend operations from 11:30 p.m.
AI Analysis
Frequently Asked Questions
- Q: What is the current water level at Wanli Creek landslide dam?
- A: As of 16:50 on the 16th, only 75cm remains before overflow. Monitoring continues.
- Q: Which areas are under mandatory evacuation?
- A: Wanrong Village in Wanrong Township and six neighborhoods in Fenglin Township.
- Q: When will Taiwan Railways suspend operations?
- A: Preventive suspension starts at 23:30 on the 16th, after the last train passes.
- Q: Which bridges are closed?
- A: Wanli Creek Bridge, Zhongxing Bridge, and Jianying Bridge are closed at night; Xibao Bridge is fully closed.
- Q: Are there alternative routes available?
- A: Use Mizutanibashi, Highway 11A, or 11C to detour via County Road 193 or Highway 11.