Shimoda Prince Hotel Opens Garden Pool Early for June Weekends
NQ Score
72/100
N1 Content Completeness
8
AI Summary (NQ-processed)
In response to rising early-summer temperatures and early leisure demand, Shimoda Prince Hotel is opening its outdoor garden pool early, limiting access to June weekends (Fri-Sun) in 2026, ahead of its scheduled July opening. The hotel will also offer early summer accommodation plans and a poolside BBQ.
AI Analysis
Frequently Asked Questions
- Q: When does the Shimoda Prince Hotel pool open?
- A: Usually in July, but for 2026, it opens early on weekends (Fri-Sun) from June 1 to June 30.
- Q: What is the cost and period for the poolside BBQ?
- A: It costs 6,500 yen per person (tax included) and runs from June 1-July 17 and Sept 1-23 by reservation.
- Q: Where is the hotel located?
- A: It is located in Shimoda City, Shizuoka Prefecture, right in front of Shirahama Chuo Beach.