Taiwan Provincial Highway 9 Chishang Bridge Reconstruction Project: Flood Control Road Under Bridge Traffic Control Until the 11th
NQ Score
0/100
AI Summary (NQ-processed)
Traffic control will be implemented on the flood control road under the Chishang Bridge on Provincial Highway 9 from now until the 11th due to reconstruction work. Vehicles can detour via the bridge''s approach ramps.